Steel Railing Product Support, Installation Information | Fence Center
Steel Railing
Steel Railing
- Steel Railing Trifold PDF
Aluminum and Steel Railing:
- Steel Railing Installation Instructions PDF
Product Specification Sheets:
- American Porch Column PDF
Frequently Asked Questions
How do the railing sections ship?
All sections come fully assembled and ready to attach to the posts. The sections come completely “racked” in a narrow box, one section per box. All you have to do is straiten the sections out to the angle you need. The same section can be used as a stair railing OR a straight railing section.
Can the sections be cut for smaller sizes?
Yes you can cut the sections down using a “saws all” or circular saw.
How do you attach the posts to the concrete or deck?
You will need to purchase a floor flange along with either lag bolts or masonry anchors, depending on the surface you are mounting the post to. Attach the flange to the post and bolt it to your surface. All of the materials need for installation are available at for purchase online.
How long does it take from the time the order is placed to receive the material?
Most styles typically take between 1 and 2 weeks to receive. Non-stock, or special orders can take up to 4 weeks in production and then 3-5 days in transit, depending on your location. You will be emailed an estimated shipment date once your order enters production.